Articles 1 - 10 of 10

Full-Text Articles in Entire DC Network

Optimal Scheduling Of Aircraft Test And Evaluation Fleets To Balance Availability For Testing And Training, Sarah E. Hoops Dec 2022

Optimal Scheduling Of Aircraft Test And Evaluation Fleets To Balance Availability For Testing And Training, Sarah E. Hoops

Theses and Dissertations

The 96th Test Wing at Eglin Air Force Base manually schedules a fleet of approximately 26 aircraft to conduct a range of missions over a one-to-two year planning period. This study automates the scheduling process, does so in a manner that optimizes multiple planning goals related to aircraft availability for training, and provides the 96th Test Wing with a software tool for the implementation that can be used by operational analysts within the command. We formulate the scheduling problem as a multiobjective, nonlinear, binary integer math program that seeks to maximize both the lowest percent of time any aircraft is …


Scheduling Aircraft Departures To Avoid Enroute Congestion, Johannes Martinez Mar 2022

Scheduling Aircraft Departures To Avoid Enroute Congestion, Johannes Martinez

Scholarly Horizons: University of Minnesota, Morris Undergraduate Journal

When scheduled flights are forecast to overcrowd sections of enroute airspace, an air traffic control authority may need to delay departures. Mixed integer linear programming can be used to compute a schedule that resolves the congestion while bringing the sum of all delays to a minimum. Standard linear programming constraint formulations for such scheduling problems, however, have poor run times for instances of realistic size. A new constraint formulation based on cycles and paths through a route graph reduces run times in computational experiments. It shows particularly strong performance for schedules that approach the worst-case solution times in standard formulations.


Improving Intercontinental Ballistic Missile Maintenance Scheduling Through The Use Of Location Analysis Methodologies, Dale L. Overholts Ii Mar 2006

Improving Intercontinental Ballistic Missile Maintenance Scheduling Through The Use Of Location Analysis Methodologies, Dale L. Overholts Ii

Theses and Dissertations

The events of September 11, 2001 have led to increased security requirements for all ICBM-related activities. Missile maintenance managers must explore new scheduling techniques to sustain weapon system readiness levels in light of published security enhancements. The problem of improving missile maintenance scheduling is modeled as a two-stage heuristic that utilizes the maximal covering location problem methodology. Maintenance activities are categorized and weighted according to published priority designation and mission impact. The model’s first stage seeks to select two security umbrellas that maximize the weighted sum of maintenance activities. Stage two seeks to determine a maintenance schedule comprised of launch …


Comparing F-16 Maintenance Scheduling Philosophies, Konstantinos Iakovidis Jun 2005

Comparing F-16 Maintenance Scheduling Philosophies, Konstantinos Iakovidis

Theses and Dissertations

In the F-16 fighter community it is believed that the flying schedule can make or break a wing's maintenance effort. Nevertheless, there is no published scientific support behind many commonly used maintenance scheduling philosophies. The problem is that a generally accepted overall scheduling philosophy to improve the long term health of the fleet does not exist. The purpose of this research is tri-fold: to identify the most important scheduling philosophies, to identify the most meaningful metrics that capture the long term health of the fleet and maintenance effectiveness, and to compare the various philosophies using the performance measures to help …


A Multiple Ant Colony Metaheuristic For The Air Refueling Tanker Assignment Problem, Ronjon Annaballi Mar 2002

A Multiple Ant Colony Metaheuristic For The Air Refueling Tanker Assignment Problem, Ronjon Annaballi

Theses and Dissertations

The performance of the Nuclear Facility (NFAC) incident module in modeling a nuclear reactor accident is evaluated. Fallout predictions are compared with air concentration measurements of I-131 in Europe over a five-day period. Two categories of source term specifications are used: NFAC-generated source terms based on plant conditions and accident severity, and user-defined source terms based on specifying the release of I-131. The Atmospheric Transport Model Evaluation Study report source term provided the needed detailed release information. The Air Force Combat Climatology Center provided weather data covering Europe during the release's 11-day duration. For the NFAC-generated source terms as few …


An Interactive Decision Support System For Scheduling Fighter Pilot Training, Cuong T. Nguyen Mar 2002

An Interactive Decision Support System For Scheduling Fighter Pilot Training, Cuong T. Nguyen

Theses and Dissertations

The U.S. Air Force is developing Modular Aircraft Support System (MASS) program to replace the current Aerospace Ground Equipment (AGE). AGE supplies electricity, nitrogen, hydraulics and other support equipment to maintenance activities at the flight line. Current AGE makes up one-third of the deployment footprint. AGE is also mostly aircraft specific, and has reliability problems. The MASS alternative focuses on modularity based on a plug-and-play approach. The technological improvements and possible reduction in the footprint make MASS a good alternative. The AF has to determine now, whether MASS can supply similar functionality and decrease the deployment footprint to theater, while …


Effects Of Shiftwork On Air Force Aircraft Maintenance Personnel, Craig A. Campbell Sep 1998

Effects Of Shiftwork On Air Force Aircraft Maintenance Personnel, Craig A. Campbell

Theses and Dissertations

This study examined the effects of converting a large aircraft maintenance squadron from 8-hour shifts to 12-hour shifts. The squadron studied converted its 24- hour maintenance work force from three 8-hour work shifts to two 12-hour work shifts incrementally, with one section converting to 12-hour shifts in January, 1996, and the remaining section converting in July, 1996. Both sections remained on 12-hour shifts until September, 1997, when both sections converted back to a three shift 8-hour operation. Health and well being, on- and off-duty accident rates, day shift vs. night shift accident rates, and the effects of stress and fatigue …


The Scheduling Process In A Depot From The Brazilian Air Force, Fabricio J. Saito Jun 1998

The Scheduling Process In A Depot From The Brazilian Air Force, Fabricio J. Saito

Theses and Dissertations

The Brazilian Air Force (BAF) in its logistic structure contains 5 Air Logistic Centers (depots). This thesis concentrates its analysis on one of the most important BAF depots located at Sao Paulo (PAMASP). This thesis explores the scheduling process currently used in PAMASP. This thesis adopted a managerial approach in a sense that it looked to take a big picture of the current process. The researcher performed field interviews with the goal of describing the process. During the visit to PAMASP, the researcher also gathered problems related to the process. The recommendations stated on this study were based on the …


Crisis Airlift Management: Effective Scheduling, David C. Penny Sep 1996

Crisis Airlift Management: Effective Scheduling, David C. Penny

Theses and Dissertations

This is a report on the basis, data, findings, and models developed for US Transportation Command and Headquarters Air Mobility Command. Focusing on the dynamic scheduling problem that arises during management of airlift assets into space-constrained airfields during a crisis, this research explains the conditions surrounding this event, discusses several areas of potential cross-functional applications, presents analysis of current performance, and provides several modeling possibilities for schedule efficiency. Past research in the Flow Management Problem (an airline flow control issue) is extensive, but specific applications in crisis airlift are long in coming, primarily due to the complexity of the environment. …


An Improved Heuristic For Intercontinental Ballistic Missile Crew Scheduling, Michael D. Shirley Jr. Dec 1994

An Improved Heuristic For Intercontinental Ballistic Missile Crew Scheduling, Michael D. Shirley Jr.

Theses and Dissertations

Creating monthly schedules for missile crews is a complex and time-consuming problem. Thousands of events must be scheduled for several hundred missile officers. The rules and regulations governing the problem are numerous, and there are currently no established measures for missile crew schedules. The scheduling software currently available only schedules a fraction of the events. The objectives of this research were to create a rule-based heuristic which could quickly produce feasible or near-feasible schedules, to make the scheduling process paperless, and to develop possible measures of effectiveness for missile crew schedules. The research was successful in each of these areas. …