Open Access. Powered by Scholars. Published by Universities.®

Digital Commons Network

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Entire DC Network

Unexpected Setbacks When Excavating – Using Gpr For Mitigating Risk: A Case Study, Samuel L. Marcum Dec 2018

Unexpected Setbacks When Excavating – Using Gpr For Mitigating Risk: A Case Study, Samuel L. Marcum

Construction Management

Whether constructing on undeveloped land or on an existing developed site, there is a risk of encountering unexpected objects when excavating. With today’s technology in Ground Penetrating Radar (GPR), this risk can generally be mitigated. Using Whiting-Turner’s construction of Stanford University’s new ChEM-H & SNI Building as an example, this case study discusses the use of GPR for underground mapping, as well as various ways to implement GPR technology. The ChEM-H & SNI site had many underground utilities that required precise pot-holing to verify locations. Although pot-holing is widely used, it is a destructive method, it is time and labor …


Moraga Commons Skatepark - Phase 2: Enhancing The Experience, Jeffrey Phunmongkol Mar 2018

Moraga Commons Skatepark - Phase 2: Enhancing The Experience, Jeffrey Phunmongkol

Construction Management

Moraga Commons Skatepark is located in the East Bay Area, of Northern California. An affluent small town, the skatepark serves as a great outdoor space where kids can exercise and enjoy. Originally built in 2003, Moraga Skatepark has been my second home ever since I started skateboarding. Myself, along with others, have noticed specific aspects of the skatepark that are poorly designed. In addition, the park has experienced general wear and depreciation from years of use. I wanted to create a potential improvement plan that would include slight skatepark design changes and ultimately addition of park amenities to improve the …